We believe that every goal, every dream, every aspiration worth pursuing deserves a fighting chance to become reality. A founding principle that has contributed to remarkable success: it all starts with visionary people who understand that together, we can do anything.

All

Dow Chemical Company World Headquarter Building
The Dow Chemical Company has selected KIRCO as its partner to develop and construct Dow's new global headquarters within their Midland, Michigan campus. This new Corporate Center building is part of Dow’s ongoing initiative to support collaboration, company growth, and innovation.
Cardinal Health Project
Henry Ford Health System selected KIRCO Development to act as their development partner for what is intended to be the first component of a $500-750 mm master planned community revitalization effort in Detroit, Michigan.
Columbia Center
The Columbia Center project was assembled from various residential and commercial properties to create a 20-acre master plan to establish a new and upgraded image for a fast growing community.
The Bluffs at Greystone – Birmingham, AL
KIRCO and KIRCOMANIX are working together with Phoenix Senior Living and EDT, Inc. to develop and construct the newest independent and assisted living community in Birmingham, AL.
Beacon Square | Pomeroy Senior Living
KIRCO and KIRCOMANIX are working together with Pomeroy Living to develop and construct the newest Beacon Square Senior Living Center in Orion Township.
Oerlikon Advanced Powder Manufacturing Center – Plymouth Township, Michigan
Kirkwood Professional Plaza
KIRCO acquired the vacant 140,000 sf office building, and redeveloped it into a first-class outpatient medical center. Henry Ford Health System occupies over 65,000 sf, expanding their already-significant presence to address the growing needs of the Dearborn community.
West Bloomfield Medical Office Building
KIRCO / Seavest have recently invested $500,000 to transform the outdated aspects of the building into the premier, Class-A Medical Office Building in the West Bloomfield area.
American Axle Manufacturing – Detroit, Michigan
KIRCO MANIX recently completed 350,000 SF of construction for American Axle Manufacturing at the company’s World headquarters in Detroit, Michigan.
Cardinal Health Medical Distribution Center: “Catalyst Converter” in the Motor City
Cardinal Health Medical Distribution Center: “Catalyst Converter” in the Motor City
Saudi Aramco
KIRCO MANIX value engineering saves Aramco Services in excess of $1 MM on project in Novi, Michigan.
Ciena Healthcare
Regency at Waterford offers an innovative, one-story, easy to navigate floor plan, 40 private rooms and 40 semi private rooms, six bariatric rooms, and a bright homelike atmosphere.
AdduXi
AdduXi, located in Rochester Hills, MI, is a French company who has recently established a new facility in the United States that will be used to service the automotive industry by way of plastic injection molding and manufacturing.
Level One Bank
KIRCO provides full maintenance services at the Level One Headquarters while also working as the owner's representative at the additional seven branches throughout Oakland and Macomb Counties.
Adept Plastics
This 75,000 SF manufacturing/office facility for Adept Plastics in Wixom, MI is the third project that KIRCO MANIX has completed for Adept Plastics within the last ten years.
Baldwin Commons
Baldwin Commons started out as a vacant 59 acre site, residing in two communities, Orion Township and Auburn Hills, MI. Prior to project completion, the project was 100% leased to tenants, totaling 376,136 SF.
Mt. Clemen’s Regional Medical Center
Class A medical facility that brings the clinical expertise of Mt. Clemens Regional to Northern Macomb County
Henry Ford Macomb Medical Office Building
KIRCO developed and constructed a 101,330 SF building on campus, which is connected to the main hospital via an attached walkway. The project required the redesign of the entire site plan, providing better site circulation.
Shelby Creek
Shelby Creek is a retail development combining retail shops and restaurants across 383,400 square feet total retail area.
Village Lakes
St. Joseph’s White Lake combines retail shops and a medical office building to create a mixed-use project with approximately 28 acres with 150,000 – 160,000 square feet of retail space and 75,000 – 80,000 square feet of medical office space.
St. Joe Waterford Urgent Care
KIRCO Health Partners converted what was a physical therapy medical office, into a space used for urgent care, an improved physical therapy, and physicians offices. The construction at St. Joseph Waterford Urgent care took about five months and covered about 6,000 SF.
Rocket Fuel
This 5,603 SF renovation was completed in 45 working days and consisted of converting the space from a furniture showroom to a contemporary office model.
Zubor Buick
The Zubor Buick renovation was in line with the new GMC Buick branding requirements and includes the renovation of the showroom and offices, a new exterior facade and entryway.
Westborn Market
Westborn Fruit Market was renovated and enlarged by KIRCO Construction in 2005. The 10,000 SF addition allowed Westborn to begin a food preparation service, introduce fresh baked and dessert goods, and expand its deli department.
Vibe Credit Union
The facility was converted from a Mexican restaurant known as Zumba Mexican Grille. The Birmingham location opened on Sept. 25, adding to the many other locations in Berkley, Canton, Livonia, Novi, South Lyon, Southfield and Sterling Heights.
Palm Restaurant
The development plan of creating an upscale restaurant in Troy, MI required the integration of an old 220,000 SF adjacent office building with a new 18,000 SF addition.
Doeren Mayhew
Doeren Mayhew’s facilities contain one of the largest LED lighting systems that has been installed in a local office which allows for daylight harvesting and results in reduced energy consumption.
Delphi Automotive Systems
A 260,000 sf world headquarters for one of the world’s largest international automotive supplier.
Meemic Insurance
MEEMIC Insurance headquarters was a Design-Build job that includes 104,000 SF of “Class A” office space on two levels and an underground executive parking garage.
Meadowbrook
Meadowbrook Plaza, located in the city of Southfield, Michigan, is part of a nine-plus-acre site condominium complex that boasts approximately 160,000 sf of premier Class A office space.
Boston Consulting Group
Boston Consulting is a firm that services a Class A client base, therefore they required a cutting edge, contemporary design.
Siemens VDO Automotive
The 220,0000 sf building was designed to house Siemens Automotive product development, research and testing labs, full chassis dyno cells, thermal chambers and office space.
Brewery Park
This 23-acre urban site was the former Stroh brewery and owned by the Stroh family. KIRCO redeveloped this three-phase 665,000 sf project with an architectural nod towards the site’s proud past.
Magna E-Car Systems
Magna E-Car Systems 82,000 sq. ft. facility is an example of re-purposing an older facility into an extremely efficient battery testing lab as well as an electric hybrid vehicle and component R & D center.
Kay Graphics
Kay Automotive Graphics specializes in the creation & supply of high-quality automotive trim. This is the third project KIRCO MANIX has worked on for Kay Automotive Graphics.
Domino’s Distribution Center
Domino’s was faced with a growing business and needed a new manufacturing and distribution facility to serve their midwestern stores. This facility is a freezer/ cooler facility with unique HVAC/ mechanical requirements.
Centerpoint Business Park
Centerpoint Business Park is a multi-phase industrial distribution development located in Obetz, OH. It totals approximately 4 million square feet on 239 acres.
Rayconnect, Inc. (Phase II)
This 30,000 SF addition for Rayconnect is located in Rochester Hills, MI. Rayconnect is a worldwide leader for fluid handling quick connectors within the Automotive and Heavy Duty Truck industry with locations in France and the United States.
Carolina Pines Industrial Park
Carolina Pines Industrial Park is located in Columbia, SC. This fully entitled industrial park will accommodate up to two-million square feet of Class A Industrial Space.
Dearborn Kidney Center
This 5862 SF Kidney/Dialysis center in Dearborn, Michigan required dedicated sanitary sewer, water distribution, and HVAC isolation.
Havenwyck Hospital
The existing facility is 85,000 sf and with the addition the total completed project will result in a 163,000 sf psychiatric treatment facility.
Crittenton Medical Building
KIRCO purchased an existing on campus building and developed /constructed an adjacent facility to create more medical office space on campus, while generating capital from existing real estate assets.
Secrest Wardle Law Offices
This 45,000 sq. ft. interior buildout of existing 50,000 sf. ft. space incorporated 90 % of existing clear maple wood doors stained for mahogany finish to match customer furniture.
SABO USA, Inc.
Sabo’s first manufacturing facility in the USA consisting of 40,800 SF total research, development, manufacturing and distribution facility.
BP Chemicals of America
BP Chemicals of America was starting a new company and needed to lease a building that offered flexibility in space design and the capability for future expansions.
Warde Laboratories
This building is approximately 53,000 square feet with Warde Lab taking approximately 40,000 square feet. It consists of 30,000 Medical Labs and 10,000 SF of office space.
Thyssen Krupp
This 71,000 sf project was a KIRCO initiated land assembly project of a site that had excellent freeway frontage with some site constraints. The building incorporates floor to ceiling glass to create a first class working environment.
Wilton Connor
Wilton Connor Packaging was provided with 1.6 million square feet of corporate office and manufacturing space. Both office and manufacturing space have functional flexibility that responds to changing client requirements.
Allure Medical Spa
This 19,242 sf space offers patients a state-of-the-art facility that is one of the first in Michigan offering innovative non-surgical as well as surgical cosmetic services.
6530 New Albany
The New Albany Portfolio is a testament to KIRCO’s mission to deliver a “Best-In-Class” experience to its clients.
Integrated Health Associates
Integrated Health Associates (IHA) was seeking to establish a market presence in the Canton, Michigan market. They were searching for a real estate firm that could help collaboratively work with tenant physicians to design a functional environment for a new experience.
DSM Engineering Plastics – Troy, Michigan
KIRCO has completed the redevelopment and construction of the new Americas headquarters for DSM Engineering Plastics located on the iconic Columbia Center campus in Troy, Mich, one of SE Michigan’s premier corporate addresses.
Tritium Building
KIRCO teamed up with a talented architect, designed and constructed the 40,000 square foot Tritium MOB that the investing doctors were proud to call home.
Henry Ford Macomb Emergency Center
Catering to the ever-growing population, Henry Ford Macomb Hospital in Macomb County, Michigan needed to make significant improvements to their facility to accommodate the increased traffic and improve their service efficiency at the same time.

Office

Dow Chemical Company World Headquarter Building
The Dow Chemical Company has selected KIRCO as its partner to develop and construct Dow's new global headquarters within their Midland, Michigan campus. This new Corporate Center building is part of Dow’s ongoing initiative to support collaboration, company growth, and innovation.
Columbia Center
The Columbia Center project was assembled from various residential and commercial properties to create a 20-acre master plan to establish a new and upgraded image for a fast growing community.
American Axle Manufacturing – Detroit, Michigan
KIRCO MANIX recently completed 350,000 SF of construction for American Axle Manufacturing at the company’s World headquarters in Detroit, Michigan.
Rocket Fuel
This 5,603 SF renovation was completed in 45 working days and consisted of converting the space from a furniture showroom to a contemporary office model.
Doeren Mayhew
Doeren Mayhew’s facilities contain one of the largest LED lighting systems that has been installed in a local office which allows for daylight harvesting and results in reduced energy consumption.
Delphi Automotive Systems
A 260,000 sf world headquarters for one of the world’s largest international automotive supplier.
Meemic Insurance
MEEMIC Insurance headquarters was a Design-Build job that includes 104,000 SF of “Class A” office space on two levels and an underground executive parking garage.
Meadowbrook
Meadowbrook Plaza, located in the city of Southfield, Michigan, is part of a nine-plus-acre site condominium complex that boasts approximately 160,000 sf of premier Class A office space.
Boston Consulting Group
Boston Consulting is a firm that services a Class A client base, therefore they required a cutting edge, contemporary design.
Siemens VDO Automotive
The 220,0000 sf building was designed to house Siemens Automotive product development, research and testing labs, full chassis dyno cells, thermal chambers and office space.
Brewery Park
This 23-acre urban site was the former Stroh brewery and owned by the Stroh family. KIRCO redeveloped this three-phase 665,000 sf project with an architectural nod towards the site’s proud past.
Secrest Wardle Law Offices
This 45,000 sq. ft. interior buildout of existing 50,000 sf. ft. space incorporated 90 % of existing clear maple wood doors stained for mahogany finish to match customer furniture.
Thyssen Krupp
This 71,000 sf project was a KIRCO initiated land assembly project of a site that had excellent freeway frontage with some site constraints. The building incorporates floor to ceiling glass to create a first class working environment.
6530 New Albany
The New Albany Portfolio is a testament to KIRCO’s mission to deliver a “Best-In-Class” experience to its clients.
DSM Engineering Plastics – Troy, Michigan
KIRCO has completed the redevelopment and construction of the new Americas headquarters for DSM Engineering Plastics located on the iconic Columbia Center campus in Troy, Mich, one of SE Michigan’s premier corporate addresses.

Industrial

Cardinal Health Project
Henry Ford Health System selected KIRCO Development to act as their development partner for what is intended to be the first component of a $500-750 mm master planned community revitalization effort in Detroit, Michigan.
Oerlikon Advanced Powder Manufacturing Center – Plymouth Township, Michigan
American Axle Manufacturing – Detroit, Michigan
KIRCO MANIX recently completed 350,000 SF of construction for American Axle Manufacturing at the company’s World headquarters in Detroit, Michigan.
Saudi Aramco
KIRCO MANIX value engineering saves Aramco Services in excess of $1 MM on project in Novi, Michigan.
AdduXi
AdduXi, located in Rochester Hills, MI, is a French company who has recently established a new facility in the United States that will be used to service the automotive industry by way of plastic injection molding and manufacturing.
Adept Plastics
This 75,000 SF manufacturing/office facility for Adept Plastics in Wixom, MI is the third project that KIRCO MANIX has completed for Adept Plastics within the last ten years.
Magna E-Car Systems
Magna E-Car Systems 82,000 sq. ft. facility is an example of re-purposing an older facility into an extremely efficient battery testing lab as well as an electric hybrid vehicle and component R & D center.
Kay Graphics
Kay Automotive Graphics specializes in the creation & supply of high-quality automotive trim. This is the third project KIRCO MANIX has worked on for Kay Automotive Graphics.
Domino’s Distribution Center
Domino’s was faced with a growing business and needed a new manufacturing and distribution facility to serve their midwestern stores. This facility is a freezer/ cooler facility with unique HVAC/ mechanical requirements.
Centerpoint Business Park
Centerpoint Business Park is a multi-phase industrial distribution development located in Obetz, OH. It totals approximately 4 million square feet on 239 acres.
Rayconnect, Inc. (Phase II)
This 30,000 SF addition for Rayconnect is located in Rochester Hills, MI. Rayconnect is a worldwide leader for fluid handling quick connectors within the Automotive and Heavy Duty Truck industry with locations in France and the United States.
Carolina Pines Industrial Park
Carolina Pines Industrial Park is located in Columbia, SC. This fully entitled industrial park will accommodate up to two-million square feet of Class A Industrial Space.
SABO USA, Inc.
Sabo’s first manufacturing facility in the USA consisting of 40,800 SF total research, development, manufacturing and distribution facility.
BP Chemicals of America
BP Chemicals of America was starting a new company and needed to lease a building that offered flexibility in space design and the capability for future expansions.
Wilton Connor
Wilton Connor Packaging was provided with 1.6 million square feet of corporate office and manufacturing space. Both office and manufacturing space have functional flexibility that responds to changing client requirements.

Senior Living

The Bluffs at Greystone – Birmingham, AL
KIRCO and KIRCOMANIX are working together with Phoenix Senior Living and EDT, Inc. to develop and construct the newest independent and assisted living community in Birmingham, AL.
Beacon Square | Pomeroy Senior Living
KIRCO and KIRCOMANIX are working together with Pomeroy Living to develop and construct the newest Beacon Square Senior Living Center in Orion Township.
Kirkwood Professional Plaza
KIRCO acquired the vacant 140,000 sf office building, and redeveloped it into a first-class outpatient medical center. Henry Ford Health System occupies over 65,000 sf, expanding their already-significant presence to address the growing needs of the Dearborn community.
West Bloomfield Medical Office Building
KIRCO / Seavest have recently invested $500,000 to transform the outdated aspects of the building into the premier, Class-A Medical Office Building in the West Bloomfield area.
Ciena Healthcare
Regency at Waterford offers an innovative, one-story, easy to navigate floor plan, 40 private rooms and 40 semi private rooms, six bariatric rooms, and a bright homelike atmosphere.
Mt. Clemen’s Regional Medical Center
Class A medical facility that brings the clinical expertise of Mt. Clemens Regional to Northern Macomb County
Henry Ford Macomb Medical Office Building
KIRCO developed and constructed a 101,330 SF building on campus, which is connected to the main hospital via an attached walkway. The project required the redesign of the entire site plan, providing better site circulation.
St. Joe Waterford Urgent Care
KIRCO Health Partners converted what was a physical therapy medical office, into a space used for urgent care, an improved physical therapy, and physicians offices. The construction at St. Joseph Waterford Urgent care took about five months and covered about 6,000 SF.
Dearborn Kidney Center
This 5862 SF Kidney/Dialysis center in Dearborn, Michigan required dedicated sanitary sewer, water distribution, and HVAC isolation.
Havenwyck Hospital
The existing facility is 85,000 sf and with the addition the total completed project will result in a 163,000 sf psychiatric treatment facility.
Crittenton Medical Building
KIRCO purchased an existing on campus building and developed /constructed an adjacent facility to create more medical office space on campus, while generating capital from existing real estate assets.
Warde Laboratories
This building is approximately 53,000 square feet with Warde Lab taking approximately 40,000 square feet. It consists of 30,000 Medical Labs and 10,000 SF of office space.
Allure Medical Spa
This 19,242 sf space offers patients a state-of-the-art facility that is one of the first in Michigan offering innovative non-surgical as well as surgical cosmetic services.
Integrated Health Associates
Integrated Health Associates (IHA) was seeking to establish a market presence in the Canton, Michigan market. They were searching for a real estate firm that could help collaboratively work with tenant physicians to design a functional environment for a new experience.
Tritium Building
KIRCO teamed up with a talented architect, designed and constructed the 40,000 square foot Tritium MOB that the investing doctors were proud to call home.
Henry Ford Macomb Emergency Center
Catering to the ever-growing population, Henry Ford Macomb Hospital in Macomb County, Michigan needed to make significant improvements to their facility to accommodate the increased traffic and improve their service efficiency at the same time.

Healthcare

The Bluffs at Greystone – Birmingham, AL
KIRCO and KIRCOMANIX are working together with Phoenix Senior Living and EDT, Inc. to develop and construct the newest independent and assisted living community in Birmingham, AL.
Beacon Square | Pomeroy Senior Living
KIRCO and KIRCOMANIX are working together with Pomeroy Living to develop and construct the newest Beacon Square Senior Living Center in Orion Township.
Kirkwood Professional Plaza
KIRCO acquired the vacant 140,000 sf office building, and redeveloped it into a first-class outpatient medical center. Henry Ford Health System occupies over 65,000 sf, expanding their already-significant presence to address the growing needs of the Dearborn community.
West Bloomfield Medical Office Building
KIRCO / Seavest have recently invested $500,000 to transform the outdated aspects of the building into the premier, Class-A Medical Office Building in the West Bloomfield area.
Ciena Healthcare
Regency at Waterford offers an innovative, one-story, easy to navigate floor plan, 40 private rooms and 40 semi private rooms, six bariatric rooms, and a bright homelike atmosphere.
Mt. Clemen’s Regional Medical Center
Class A medical facility that brings the clinical expertise of Mt. Clemens Regional to Northern Macomb County
Henry Ford Macomb Medical Office Building
KIRCO developed and constructed a 101,330 SF building on campus, which is connected to the main hospital via an attached walkway. The project required the redesign of the entire site plan, providing better site circulation.
St. Joe Waterford Urgent Care
KIRCO Health Partners converted what was a physical therapy medical office, into a space used for urgent care, an improved physical therapy, and physicians offices. The construction at St. Joseph Waterford Urgent care took about five months and covered about 6,000 SF.
Dearborn Kidney Center
This 5862 SF Kidney/Dialysis center in Dearborn, Michigan required dedicated sanitary sewer, water distribution, and HVAC isolation.
Havenwyck Hospital
The existing facility is 85,000 sf and with the addition the total completed project will result in a 163,000 sf psychiatric treatment facility.
Crittenton Medical Building
KIRCO purchased an existing on campus building and developed /constructed an adjacent facility to create more medical office space on campus, while generating capital from existing real estate assets.
Warde Laboratories
This building is approximately 53,000 square feet with Warde Lab taking approximately 40,000 square feet. It consists of 30,000 Medical Labs and 10,000 SF of office space.
Allure Medical Spa
This 19,242 sf space offers patients a state-of-the-art facility that is one of the first in Michigan offering innovative non-surgical as well as surgical cosmetic services.
Integrated Health Associates
Integrated Health Associates (IHA) was seeking to establish a market presence in the Canton, Michigan market. They were searching for a real estate firm that could help collaboratively work with tenant physicians to design a functional environment for a new experience.
Tritium Building
KIRCO teamed up with a talented architect, designed and constructed the 40,000 square foot Tritium MOB that the investing doctors were proud to call home.
Henry Ford Macomb Emergency Center
Catering to the ever-growing population, Henry Ford Macomb Hospital in Macomb County, Michigan needed to make significant improvements to their facility to accommodate the increased traffic and improve their service efficiency at the same time.

Retail

Level One Bank
KIRCO provides full maintenance services at the Level One Headquarters while also working as the owner's representative at the additional seven branches throughout Oakland and Macomb Counties.
Baldwin Commons
Baldwin Commons started out as a vacant 59 acre site, residing in two communities, Orion Township and Auburn Hills, MI. Prior to project completion, the project was 100% leased to tenants, totaling 376,136 SF.
Shelby Creek
Shelby Creek is a retail development combining retail shops and restaurants across 383,400 square feet total retail area.
Village Lakes
St. Joseph’s White Lake combines retail shops and a medical office building to create a mixed-use project with approximately 28 acres with 150,000 – 160,000 square feet of retail space and 75,000 – 80,000 square feet of medical office space.
Zubor Buick
The Zubor Buick renovation was in line with the new GMC Buick branding requirements and includes the renovation of the showroom and offices, a new exterior facade and entryway.
Westborn Market
Westborn Fruit Market was renovated and enlarged by KIRCO Construction in 2005. The 10,000 SF addition allowed Westborn to begin a food preparation service, introduce fresh baked and dessert goods, and expand its deli department.
Vibe Credit Union
The facility was converted from a Mexican restaurant known as Zumba Mexican Grille. The Birmingham location opened on Sept. 25, adding to the many other locations in Berkley, Canton, Livonia, Novi, South Lyon, Southfield and Sterling Heights.
Palm Restaurant
The development plan of creating an upscale restaurant in Troy, MI required the integration of an old 220,000 SF adjacent office building with a new 18,000 SF addition.