Rayconnect Phase 2

KIRCO MANIX

KIRCO MANIX recently completed a 30,000 square foot addition for Rayconnect in Rochester Hills, Michigan. Rayconnect is a worldwide leader in the manufacturing of fluid handling quick connectors within the automotive and heavy duty truck industry with locations in France and the United States. KIRCO MANIX constructed their original LEED Gold facility in 2009. The additional space will allow Rayconnect to expand their manufacturing, assembly, and warehousing operations. The addition is placed over an existing storm retention area which required the construction of an underground storm water retention system.

More Projects

KIRCO MANAGEMENT
Smith Bros Tool

Smith Bros. Tool’s Shelby Township, MI campus houses a manufacturer established in 1981 that builds custom tooling, jigs, fixtures and ground support equipment for the space, aerospace and defense industries. The facilities support in-house tool design, weld fabrication, and advanced CNC machining for mission-critical programs.

KIRCO Management keeps the buildings running so production stays on schedule.

KIRCO MANAGEMENT
2350 Austin Ave.

Rayconnect is ARaymond’s fluid connector manufacturing plant in Rochester Hills, MI. The plant covers all stages of the Quick Connector design and manufacturing process. The 105,000-square-foot facility allows the plant around the clock.

KIRCO Management’s maintenance planning and fast response help keep production lines moving.

KIRCO MANIX
Yarema Die & Engineering

Management at Yarema Die and Engineering needed additional manufacturing and office space to nurture their growth and improve their operational efficiency. Their initial strategy was to build a new facility and dispose of the existing facilities. KIRCO analyzed all of the options for providing more space and ultimately designed a strategy to add on to the existing facility as a way to reduce the costs associated with the project. One phase in particular required KIRCO MANIX to build a new manufacturing building around the existing plant, which remained operational during the entire project.